How much manpower and time does it take to install the container?
Standard installation requires 4 workers and takes approximately 2 hours to complete 1 unit.
How many days is your fastest lead time?
This depends on the quantity. For regular sizes, our lead time is generally 7-15 days after receiving the deposit.
Does your product experience water leakage?
No, we maintain strict professional standards and quality control. So far, we have never experienced water leakage problems in overseas orders.
Do I need to prepare a foundation for the container house?
If the land is stable and will not subside, there is basically no need for foundations. We provide complete drawings and guidance based on geological conditions.
How is the container house insulated?
Wall panels are made of 50mm rock wool sandwich panels. These can be upgraded to 75mm or 100mm for extreme weather conditions.
How do you guarantee product quality?
Every production step is checked by quality inspectors using vernier calipers for thickness and surface inspection. Photos and videos are provided before delivery.