Mobile Foldable Canteen Unit with Stainless Steel Kitchen Equipment for Construction Site Modular Prefab House Foldable House Container House

Still deciding? Get samples of $ !
Order Sample

Product Description

i

Basic Information

Model NO.
SY-S-7122
Dimensions
20FT 30FT 40FT
Center Pillar
150*150*T2.5mm Q235B
Main Body
75EPS Board
Middle Floor
Fireproof Glass Magnesium Floor 15mm
Warranty
40 Years
Usage
Dormitories, Warehouse, Villa, Temporary Offices
Certification
CE, ISO SGS UL
HS Code
9406900090
Capacity
4000 pieces/Year
Mobile Foldable Canteen Unit
Modular Prefab House

Product Parameters

Specifications Details
Option Size Smaller: W4820*L5900*H2480 mm
20ft: W6320*L5900*H2480 mm
30ft: W6240*L9000*H2480 mm
40ft: W6240*L11800*H2480 mm
Main Material Galvanized steel structure with sandwich wall panel and doors, windows, etc.
Service Life 30-40 years
Steel Structure 2.5 mm hot galvanized steel structure with 4mm corner casts; MgO board floor; PVC flooring; 75mm rock wool/EPS sandwich panel.
Roof 3-4mm Hot galvanized steel structure with galvanized steel covering and 50mm EPS sandwich panel.
Advantages Fast installation (2 hours/set); Anti-rust; Waterproof; Fireproof (A grade); Wind-resistant (10 grade); Anti-seismic.
Foldable House Interior
Container House Design
Modular Living Unit
Kitchen Equipment
Construction Site Housing
Mobile Canteen

Quality & Service

Quality is at the heart of what we do. We are focused on creating high-quality products and processes, and delivering excellent customer service. Integrated housing solutions have been utilized for large-scale projects including shelter hospitals and medical isolation wards in more than 30 regions, providing essential support for infrastructure needs.

Our production facilities have passed ISO international quality system certification. Our business scope covers Southeast Asia, Europe, and the United States, supported by a strong reputation and unique business style.

Factory Certificate
Production Line
Loading Area
Container Transport
Package Gross Weight
Final Assembly
Modular Design
Project Completion
Shipping Logistics
?

Frequently Asked Questions

How to make the payment?
TT and letter of credit are acceptable. Generally, a 30% deposit is required before production and a 70% balance before loading.
What is the delivery time?
This depends on the order quantity. Generally speaking, the delivery time will be within 15 to 30 days.
How to ship the units?
The units are shipped via standard ocean container loading for secure and efficient transport.
How to install the modular house?
We provide detailed installation instructions and videos. If necessary, technical personnel can be sent to assist, though related travel and visa fees are provided by the buyer.
How do you ensure the quality of the product?
Every product undergoes strict testing procedures. We maintain a 100% quality standard before delivery through rigorous internal control.
Is it difficult to assemble the room?
Not at all. As long as you can use basic electric tools, you can build a house independently according to our provided construction drawings.

Related Products