Structure
Light Steel Structure
Door
Color Steel Sheet Door
Roof
Sandwich Corrugated Panel
Window
Aluminium Alloy Sliding
Ceiling
PVC/Calcium Silicate Board
Advantage
Economical, Easy Install
Usage
Temporary Offices / Camp
Prefabricated Light Steel House Prefab House with Base Plate
| Component |
Specification Details |
| Product Name | Modular houses - K-style |
| Column | 80# C style steel |
| Ground beam | 80# C style steel |
| Floor beam | 80# C style steel and 50# C style steel joint together |
| Secondary floor beam | 80# C style steel |
| Roof Structure | 80# C style steel welding as truss & 40# angle steel as purlin |
| Wall panel | 50/75/100mm thick EPS/Glass wool/Rock wool/Propor/PU sandwich panel |
| Roof tile | 30/50/75/100mm thick corrugated sandwich panel / steel sheet |
| Floor | Light magnesium board or plywood |
| Window | UPVC or aluminum sliding window with fly screen |
| Door | Aluminum frame with panel, security door including lock |
| Steel structure | Anti-rust, painted. Include rivet, screw |
| Veranda, Garage and fence can be customized as required. |
Performance Data:
• Roof load: 0.3kn/m2
• Floor load: 1.5kn/m2
• Wind load: 0.3kn/m2 (Against level 10 typhoon)
• Earthquake resistance: Magnitude-7 earthquake
* Note: Structure can be reinforced if higher criteria are required.
Key Features & Advantages
✓
Long Lifespan: Capacity of 15-20 years with proper maintenance.
✓
Fast Assembly: Prefabricated design makes it easy to install and disassemble.
✓
Portable: Lightweight design for easy storage, transport, and relocation.
✓
Eco-Friendly: Recyclable materials and multiple-use capability.
✓
Wide Application: Ideal for offices, construction sites, schools, and shops.
Frequently Asked Questions
1. What are the advantages compared to traditional brick houses?
It offers a longer lifetime, excellent earthquake proofing, green energy saving, and is significantly faster and easier to install.
2. What is the expected life span of these prefab houses?
The structure is durable for more than 15-20 years with regular and frequent maintenance.
3. What is the maximum number of storeys allowed?
Typically up to 3 storeys due to shipping container loading limits and structural stability requirements.
4. How long does the installation process take?
A team of 6 experienced workers can typically install approximately 100sqm of housing per day.
5. What is the loading capacity of a 40HQ container?
Approximately 300 square meters of housing materials can be loaded into a single 1 X 40HQ container.
6. Is the house resistant to extreme weather?
Yes, it is designed to withstand up to level 10 typhoons and magnitude-7 earthquakes under standard configurations.